SummerrainM199011 SummerrainM199011
  • 03-11-2022
  • Mathematics
contestada

1. A construction company delivered ton of sand and ton of gravel . How much more sand than gravel was delivered? Simplify your answer if possible.

Respuesta :

MynorC29704 MynorC29704
  • 03-11-2022

EXPLANATION

Tons of sand = 5/6

Tons of gravel = 1/6

The relationship between the tons of sand and tons of gravel is as follows:

[tex]\text{Ratio = }\frac{\frac{5}{6}}{\frac{1}{6}}=5[/tex]

The ratio is 5 more times tons of sand than tons of gravel.

Answer Link

Otras preguntas

Which of these items would be a renewable resource? A. coal b. trees c. gasoline d. oil
Maribel wants to skate 1 1/2 miles on Monday. If she skates 9/10 miles on Monday morning and 2/3 of that distance on Monday afternoon will she reach her goal? P
Which tense allows for the sequencing of two or more noncontinuous events that occur in the same time period?
How old is the United states
Calculate the number of kilojoules to warm 125 g of iron from 23.5 °C to 78.0 °C.
How can you reduce the stress of completing a project? A. Put off the project until the last minute. B. Take a break from the project when you need it. C. Devot
Solve. x – 6 = –14 a. –20 b. 20 c. 8 d. –8
What type of phrase is underlined in the sentence below? Have you been to the new Thai restaurant that opened last month? Question 6 options: participial ph
how would you write this as an algebraic equation? k less than 24
how many decameters are there in 14 meters