skowndoensm
skowndoensm skowndoensm
  • 02-01-2021
  • Computers and Technology
contestada

Select the correct answer.
What helps the project team to identify the latest software build?
A.
defect
B.
version number
C.
test plan
D.
test environment
E.
hardware

Respuesta :

ianhulett
ianhulett ianhulett
  • 05-01-2021

Answer:

B version number

Explanation:

Answer Link

Otras preguntas

Referring to the diagram above, predict what will happen when the switch is closed. Explain your answer.
HELP PLEASE!!!! 40 POINTS!!! JUAT HELP AS FAST AS POSSIBLE!!!
John has the world figured out. He knows how everything works, is very confident he will succeed, and knows that everyone admires him. What describes this adole
A pendulum consisting of a 0.5 kg mass tied to a 0.3 m string is set into oscillation at the same moment that a stone is dropped from a 44.1-m-tall building. ho
One number is 4 less than 3 times another.their sum is -16. find the smaller
What was the U.S. military goal in the Pacific?
What was Japanese Reconstruction? A) It was a three-phrase operation to end Japanese military rule and rebuild Japan’s economy. B) It was an attempt by the Unit
An artist who drew the human body during the renaissance
How far from the base of the house do you need to place a 15-foot ladder so that it exactly reaches the top of a 12-foot tall wall?
Why did the Indus Valley civilization pay more attention to hygiene