liluv4590 liluv4590
  • 02-04-2019
  • Mathematics
contestada

A potter works 4 days a week, makes 14 pots per day on average, and charges $24 a pot. Money per 4-day workweek?

Respuesta :

greubel80
greubel80 greubel80
  • 02-04-2019
Step by Step:

14 average pots x 4 days a week = average money made

14x4= 56

56 pots a 4-day week x 24$ a pot

56x24 = 1344$
Answer Link

Otras preguntas

What is the solid geometric shape formed by a mineral? 1) rock 2) ore 3) crystal 4) sediment
2024 challenge math answer sheet
How was the development of the steam engine in response to a fuel shortage?
2/3 divided by 1/2 On a grid
What expression is equivalent to (5z²+3z+ 2)²? O 5z²+3z²+4 5z²+9z²+4 25z4+30z³+19z²+12z+4 O 25z4+30z³+29z²+12z+4
A driver is 35 feet below sea level . After he swims up 10 feet toward the surface , what is his elevation
Solve Please Don’t Understand new material teacher is teaching
10. Two sides of a triangle are of length 6 cm and 2.5 cm. The length of the third side of triangle cannot be (d) 3.2 cm (a) 4.8 cm (b) 5 cm (c) 5.5 cm bea
When the spine curves inward at the low back, What postural deviation is it? 1) Lordosis 2) Kyphosis 3) Scoliosis 4) Flatback
Function f is represented by f(x) = 5x+10Find f(-3)Find the value of x such that f(x) = 90 is true